TABULATION
OF REVISED PAGES
PAGE |
REVISIONS |
|
PAGE |
REVISIONS |
|
||||||||||||||
0 |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
0 |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
||||
1 |
|
|
|
|
|
|
|
|
|
51 |
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
|
52 |
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
|
53 |
|
|
|
|
|
|
|
|
|
4 |
|
|
|
|
|
|
|
|
|
54 |
|
|
|
|
|
|
|
|
|
5 |
|
|
|
|
|
|
|
|
|
55 |
|
|
|
|
|
|
|
|
|
6 |
|
|
|
|
|
|
|
|
|
56 |
|
|
|
|
|
|
|
|
|
7 |
|
|
|
|
|
|
|
|
|
57 |
|
|
|
|
|
|
|
|
|
8 |
|
|
|
|
|
|
|
|
|
58 |
|
|
|
|
|
|
|
|
|
9 |
|
|
|
|
|
|
|
|
|
59 |
|
|
|
|
|
|
|
|
|
10 |
|
|
|
|
|
|
|
|
|
60 |
|
|
|
|
|
|
|
|
|
11 |
|
|
|
|
|
|
|
|
|
61 |
|
|
|
|
|
|
|
|
|
12 |
|
|
|
|
|
|
|
|
|
62 |
|
|
|
|
|
|
|
|
|
13 |
|
|
|
|
|
|
|
|
|
63 |
|
|
|
|
|
|
|
|
|
14 |
|
|
|
|
|
|
|
|
|
64 |
|
|
|
|
|
|
|
|
|
15 |
|
|
|
|
|
|
|
|
|
65 |
|
|
|
|
|
|
|
|
|
16 |
|
|
|
|
|
|
|
|
|
66 |
|
|
|
|
|
|
|
|
|
17 |
|
|
|
|
|
|
|
|
|
67 |
|
|
|
|
|
|
|
|
|
18 |
|
|
|
|
|
|
|
|
|
68 |
|
|
|
|
|
|
|
|
|
19 |
|
|
|
|
|
|
|
|
|
69 |
|
|
|
|
|
|
|
|
|
20 |
|
|
|
|
|
|
|
|
|
70 |
|
|
|
|
|
|
|
|
|
21 |
|
|
|
|
|
|
|
|
|
71 |
|
|
|
|
|
|
|
|
|
22 |
|
|
|
|
|
|
|
|
|
72 |
|
|
|
|
|
|
|
|
|
23 |
|
|
|
|
|
|
|
|
|
73 |
|
|
|
|
|
|
|
|
|
24 |
|
|
|
|
|
|
|
|
|
74 |
|
|
|
|
|
|
|
|
|
25 |
|
|
|
|
|
|
|
|
|
75 |
|
|
|
|
|
|
|
|
|
26 |
|
|
|
|
|
|
|
|
|
76 |
|
|
|
|
|
|
|
|
|
27 |
|
|
|
|
|
|
|
|
|
77 |
|
|
|
|
|
|
|
|
|
28 |
|
|
|
|
|
|
|
|
|
78 |
|
|
|
|
|
|
|
|
|
29 |
|
|
|
|
|
|
|
|
|
79 |
|
|
|
|
|
|
|
|
|
30 |
|
|
|
|
|
|
|
|
|
80 |
|
|
|
|
|
|
|
|
|
31 |
|
|
|
|
|
|
|
|
|
81 |
|
|
|
|
|
|
|
|
|
32 |
|
|
|
|
|
|
|
|
|
82 |
|
|
|
|
|
|
|
|
|
33 |
|
|
|
|
|
|
|
|
|
83 |
|
|
|
|
|
|
|
|
|
34 |
|
|
|
|
|
|
|
|
|
ATTACHMENTS/APPENDIX |
|||||||||
35 |
|
|
|
|
|
|
|
|
|
A |
|
|
|
|
|
|
|
|
|
36 |
|
|
|
|
|
|
|
|
|
B |
|
|
|
|
|
|
|
|
|
37 |
|
|
|
|
|
|
|
|
|
C |
|
|
|
|
|
|
|
|
|
38 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
39 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
40 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
41 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
42 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
43 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
44 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
45 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
46 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
47 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
48 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
49 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Saipem Asia Sdn. Bhd
Lamma Power
Station Extension – Supply and Installation of Submarine Gas Pipeline Water
Quality Monitoring Report (Version
1.0) April 2005 |
|
|
|
Approved By |
|
|
|
(Project
Director: Dr. HF Chan) |
|
REMARKS: The information supplied
and contained within this report is, to the best of our knowledge, correct at
the time of printing. CINOTECH accepts no
responsibility for changes made to this report by third parties. |
CINOTECH CONSULTANTS LTD Room 1602-1610, Delta House, 3 On Tel: (852) 2151 2083 Fax: (852) 3107 1388 Email: info@cinotech.com.hk |
Table
of contents
Environmental Monitoring Works
Implementation Status of
Mitigation Measures
Summary of Non-compliance of
the Environmental Quality Performance Limit
Summary of Complaints and
Prosecution
4 CONCLUSIONS
AND RECOMMENDATIONS
lIST
OF TABLES
Table 1.1 Key
Contacts of ET-Cinotech
lIST
OF Figures
Figure 1.1 Layout
of the Submarine Gas Pipeline
lIST OF APPENDIces
A
Construction Phase Mitigation Measures and their
Implementation (Gas Pipeline)
List of Abbreviation
EIA |
Environmental Impact
Assessment |
EM&A |
Environmental Monitoring
and Audit |
ET |
Environmental Team |
GPS |
Global Positioning System |
GRS |
Gas Receiving Station |
HEC |
Hong Kong Electric Co. Ltd |
LNG |
Liquefied Natural Gas |
1.
This is the third
Environmental Monitoring and Audit (EM&A) Report prepared by Cinotech Consultants Limited (ET-Cinotech)
for the project “Lamma Power Station Extension –
Supply and Installation of Submarine Gas Pipeline” (the Project). This document reported the findings of
EM&A Works conducted in April 2005.
Environmental Monitoring Works
Water Quality
2.
No environmental
monitoring for the Project was carried out in the reporting month.
3.
No environmental
complaint and prosecution were received during the reporting month.
4.
Pipelaying and trenching
will be the major activities in the coming month. No key environmental issue was identified.
1.1
Hong Kong Electric
Holdings Ltd. (HEC) intends to develop a 1,800 MW power station in Hong Kong
Special Administrative Region (HKSAR) to meet the forecast increase in
electricity demand to cope with the social and economical growth of the HKSAR.
The proposed power station will be located at reclaimed land in the south of
the existing Lamma Power Station at the western edge
of
1.2
The proposed
Power Station will use natural gas as fuel to generate electricity. The natural
gas will be supplied from Guandong Liquefied Natural
Gas (GD LNG) Terminal located at Cheng Tou Jiao of Shenzen PRC via a 20 inches diameter gas submarine
pipeline. Figure 1.1 shows the layout of
the submarine gas pipeline.
1.3
HEC awarded Saipem Asia Sdn. Bhd. (hereafter called “the Contractor) for the design,
engineering, supply of materials, fabrication, testing at works, delivery to
site, complete erection including pre-trenching, pipe laying, rock dumping,
testing and pre-commissioning at site, preservation during the Defects
Liability Period of Submarine Gas Pipeline under to Project titled “Lamma Power Station Extension – Supply and Installation of
Submarine Gas Pipeline” (hereinafter called “the Project”). Cinotech
Consultants Limited was subsequently commissioned by the Contractor as the
Environmental Team (ET-Cinotech) to provide
environmental consultancy services and to undertake the Environmental
Monitoring and Audit (EM&A) works for the Project.
1.4
The Project
works include Pre-Trenching works, Pipe-Lay installation, Post-Lay Trenching
(Jetting) and Rock Dumping works related to the installation of 92 km of 20
inches diameter Submarine Gas Pipeline between Guandong
Liquefied Natural Gas Terminal (GD LNG) and the receiving point at Gas
Receiving Station (GRS) at South-West of Lamma
Extension on Lamma Island of Hong Kong – SAR.
1.5
Different
parties with different levels of involvement in the project organization
include:
· Project Proponent –Hong Kong Electric Holdings Ltd.
(HEC)
· Contractor – Saipem Asia Sdn. Bhd.
· Environmental Team (ET-Cinotech)
– Cinotech Consultants Limited
1.6
The
responsibilities of respective parties are detailed in Section 3 of the
EM&A Requirements Review (Review) and the project organization chart is
presented in Figure 3.1 of the Review. The key contacts of the ET-Cinotech are shown in Table 1.1.
Table 1.1 Key Contacts of ET-Cinotech
Name |
Role |
Phone No. |
Fax No. |
|
ET-Cinotech |
Dr. Priscilla Choy |
Project Manager of ET |
2151 2089 |
3107 1388 |
Ms. Winniss Kong |
Coordinator |
2151 2068 |
3107 1388 |
|
Mr. Henry Leung |
Monitoring Team Leader |
2151 2087 |
3107 1388 |
1.7
The dredging
works at Lamma Shore Approach were completed on 13th
March 2005 whist the corresponding monitoring works were
finished on
1.8
The EM&A programme requires water quality monitoring during the dredging works of the
2.1
No water quality monitoring was carried out in the reporting month.
3.1
The implementation status of mitigation measures is summarized in
Appendix A.
3.2
No non-compliance was recorded in the reporting month.
3.3
No environmental complaint and prosecution was received during the
reporting month. The complaint log for
the works is provided in Appendix B.
4.1
No environmental monitoring
works were performed in the reporting month.
4.2
Pipelaying and
trenching will be the major activities in the coming month. No key
environmental issue was identified.